How Detention Basin Routing Prevents Flooding and Protects Your Project

What Is Detention Basin Routing?

Detention basin routing is the process of calculating how an inflow hydrograph changes as it passes through a detention basin. The goal is to reduce peak discharge, delay peak timing, and minimize flooding and erosion downstream.

A detention basin acts as a buffer: runoff enters quickly during storms, storage volume increases, and water is gradually released through an outlet structure, producing a flatter, delayed outflow hydrograph.

Basin Routing Mechanism in Five Lines

  1. Runoff enters the basin, inflow rises.
  2. Water level increases, storage volume grows.
  3. Head (pressure) on the outlet increases, boosting outflow.
  4. Inflow peak passes but stored water continues to discharge.
  5. Basin drains and resets for the next storm.

The Modified Puls Method

The Modified Puls method is a standard for routing hydrographs through detention basins. It relates:

  • Storage (S) – Volume of water in the basin at a given elevation.
  • Inflow (Qin) – Runoff entering the basin.
  • Outflow (Qout) – Water released through the outlet structure.

These relationships are derived from volume–elevation curves and orifice/weir equations for the outlet structure.

Storage-Indication Equation

(2S/Δt + Qout) = Qin + (2Sprevious/Δt − Qout_previous)
        

By applying this over multiple time steps, engineers produce an accurate outflow hydrograph from any inflow event.

Key Design Considerations

  • Basin Geometry - Surface area and depth influence storage capacity.
  • Outlet Design - Orifice, weir, or multi-stage outlets control different storm events.
  • Time Step (Δt) - Smaller time steps yield more accurate results.
  • Regulatory Criteria - Many codes require post-development flows ≤ pre-development flows.

Benefits of Proper Basin Routing

  • Reduces flood peak to protect downstream areas.
  • Controls erosion by managing flow velocity.
  • Ensures compliance with stormwater regulations.
  • Enhances water quality through extended detention.

Example: Peak Flow Reduction

A 24-hour storm produces a peak inflow of 200 cfs. Without storage, this hits downstream channels directly. With a designed basin and outlet, the peak outflow may be reduced to 100 cfs and delayed by several hours, reducing flood risk.

Conclusion

Detention basin routing is essential for flood control and regulatory compliance. Using the Modified Puls method ensures accurate predictions, safer developments, and protection for downstream infrastructure.

Need Stormwater Design Expertise?

We provide professional detention basin design and routing analysis for residential, commercial, and mixed-use developments.

Request a Project Consultation
Next
Next

Subdivision Planning Tips for Developers: Maximize Yield & Pass Permits